Installation of High Pressure Boiler and 4.4 Megawatt Power Plant for Pak Ethanol (Pvt.) Ltd.
Noveltech International Inc. was tasked with the complete Installation and Commissioning of a Power Plant consisting of a High Pressure Boiler and Steam Turbine to fulfill the requirements of the new Line-II Distillery Complex as well as the existing Pak Ethanol Distillery as well as the nearby polymer plant and Sugar Mill.
A boiler with a generation capacity of 40 tons of steam per hour at 65 bar pressure was suggested to the client and approved for installation.
Noveltech International carried out the complete undertaking in house including the complete Engineering Design, Civil, Mechanical, Electrical and Instrumentation works.
The plant was successfully handed over to the site management after commissioning after meeting or exceeding all specified process conditions.
Contract Type | EPC Turnkey |
Location | Matli, Badin |
Client | Pak Ethanol (Pvt.) Ltd. |
Civil and Mechanical Structure Work for High Pressure Boiler and Power Plant Section
Civil and Mechanical Structure Work for High Pressure Boiler and Power Plant Section
Civil and Mechanical Structure Work for High Pressure Boiler and Power Plant Section
Installation and Alignment Work for 4.4 MW Steam Turbine Generator Set
Civil and Mechanical Structure Work for High Pressure Boiler and Power Plant Section
Erection and Installation Work for Boiler Drum, Evaporation Section and Water Wall
Erection and Installation Work for Boiler Structure, Bagasse Carrier and FD Fan
Erection and Installation Work for Boiler Furnace, Primary and Secondary Superheater and Atemperator Loop
Insulation Work for Boiler and Installation of Boiler Feed Pump
Complete 40 Tons per Hour, 67 Kg/cm2 High Pressure Boiler
Insulation Work for Boiler and Installation of Boiler Feed Pump
Final Installation of 4.4 MW Steam Turbine Generator Set
Boiler Auxiliaries’ Panel, Main Boiler MCC Panel and Boiler Instrumentation Panel